lnf.cymru stimulus sheet · Geography · Year 8

The Pont y Glyn flood enquiry: storm hydrograph, rainfall data and witness accounts

The valley town of Pont y Glyn, the Afon Glyn river gauge data, and the three resident witness statements are invented for this lesson, modelled on real Welsh valley flood enquiries.

1: Official river gauge data and storm hydrograph (14 October 2026)

On Wednesday 14 October 2026, a heavy autumn storm crossed the Afon Glyn drainage basin. Natural Resources Wales (invented gauge station Pont y Glyn Bridge) recorded hourly rainfall and half-hourly river discharge. The bankfull discharge of the Afon Glyn through the town is 40.0 cumecs (cubic metres per second, m³/s): whenever discharge rises above 40.0 cumecs, water spills over the flood wall onto High Street.

Time (24-hr clock) Hourly rainfall ending at this time (mm) River discharge at Pont y Glyn Bridge (cumecs, m³/s) River status (Bankfull threshold = 40.0 cumecs)
12:00 2 10.0 Normal baseflow inside channel
13:00 12 12.0 Rising limb begins
14:00 18 (Peak rainfall) 15.0 Rising inside channel
14:30 (10 mm fell between 14:00 and 15:00) 18.0 Inside channel (22.0 cumecs below bankfull)
15:00 10 24.0 Steep rising limb
16:00 6 40.0 Bankfull reached: water reaches top of flood wall
16:30 0 43.5 Flooding High Street
17:00 0 49.0 Flooding High Street
17:30 0 52.0 (Peak discharge) Peak flood depth on High Street (12.0 cumecs above bankfull)
18:00 0 48.0 Flooding High Street (falling limb begins)
19:00 0 40.0 River drops back to bankfull; floodwater recedes
20:00 0 28.0 Inside channel (falling limb)
21:00 0 18.0 Inside channel

Total storm rainfall (12:00 to 16:00): 2 + 12 + 18 + 10 + 6 = 48 mm.
Lag time formula: Lag time = Time of peak river discharge − Time of peak rainfall.

2: Three witness statements submitted to Pont y Glyn Community Council

Witness A: Siân Parry, owner of High Street Bakery (50 m from Pont y Glyn Bridge)

“The rain was hammering against our shop window at two o’clock in the afternoon (14:00). Even after the rain stopped at four o’clock, the river kept rising faster than I have ever seen. Dirty river water started pouring over the top of the flood wall onto High Street at quarter past four (16:15), and by half past five (17:30) it was 30 cm deep inside my bakery. This flood is 100% the fault of the greedy new Glanrafon Retail Park built upstream last spring; their massive tarmac car park is the worst planning disaster in Welsh history and the council should force them to dig it all up tomorrow!”

Witness B: Mark Evans, Site Manager at Glanrafon Retail Park (800 m upstream of the bridge)

“People are unfairly blaming our new 4.5-hectare tarmac car park, which opened in March 2026 alongside the river. Our car park had nothing to do with the flood! It was a freak tropical monsoon that dropped over 100 mm of rain in four hours. Furthermore, I looked out of my office window at half past two (14:30) and the Afon Glyn was already overflowing its banks onto High Street before rainwater from our car park pipes even reached the river. Local shopkeepers are just looking for someone rich to blame so they can claim compensation.”

Witness C: Dr Owen Rhys, Catchments Hydrologist & retired Geography Head of Department

“To understand the 14 October 2026 flood, the council must look at both physical and human factors. First, three weeks of wet autumn weather had already saturated the steep upland peat bogs above the valley, so very little rainwater could soak into the moorland soil. Second, we can compare this storm directly with the storm of 18 November 2019, which also dropped exactly 48 mm of rain over four hours. In 2019, before the 4.5-hectare riverside meadow was covered in impermeable tarmac for the retail park, the lag time was 5 hours 0 minutes and peak discharge reached 38.0 cumecs (staying 2.0 cumecs below bankfull, so High Street did not flood). In 2026, storm drains from the impermeable tarmac fed rainwater straight into the river, cutting the lag time to 3 hours 30 minutes and pushing peak discharge up to 52.0 cumecs.”

3: Comparison table: 2019 storm (before retail park) vs 2026 storm (after retail park)

Drainage basin feature 18 November 2019 storm (Permeable grass meadow) 14 October 2026 storm (4.5 ha impermeable tarmac car park)
Total storm rainfall (mm) 48 mm 48 mm
Peak rainfall time and amount 14:00 (18 mm) 14:00 (18 mm)
Peak river discharge (cumecs) 38.0 cumecs (at 19:00) 52.0 cumecs (at 17:30)
Lag time (peak rain to peak discharge) 5 hours 0 minutes (5.0 hours) 3 hours 30 minutes (3.5 hours)
Did the river exceed 40.0 cumecs bankfull? No (stayed 2.0 cumecs below bankfull; 0 hours flooded) Yes (12.0 cumecs above bankfull; flooded from 16:00 to 19:00)